Sandeep Enterprises
W.NR. 1.2083
Special Steels

Special Steel Includes Cold Work Steel, Hot Work Steel, Plastic Mould Steel, High Speed Steel, High Strength Steel, Abrasion Resistant Steel. These tool materials adhere to great quality demands of steel like temper, strength, toughness, resistance to tempering, hardening capacity, dimensional stability etc. The range of Tool Steel in our store includes products from renowned manufacturers.

STEELW.NR. 1.2083

Main characteristics and applications

Martensitic stainless steel with a high hardenability, good polishing properties, excellent resistance to corrosion and rust.
Its applications are plastic moulds, high wear resistance cavities particularly for processing of acid aggressive plastics (i.e. acetate and PVC), or plastics containing abrasive fillers. Suited for the manufacture of transparent plastics such as moulds for optical and medical products.

Comparable standards
DINW.NrJIS
X42Cr131.2083SUS420F
Chemical composition (typical; in weight %)
CSiMnP (max)S (max)Cr
0.38-0.45<1.00<1.000.030.0312.50-14.50
Critical points

Ac1 790 °C

Ac3 850 °C

Ms 165 °C

Production technology

EAF – LF – VD - Forging – Heat treatment +A

US specification

In according to standard EN10228-3 Class 4 and standard SEP 1921 Class E/e

Delivery condition

WW.NR. 1.2083 is delivered annealed condition, with hardness max 241 HB (23 HRC).

Physical properties (reference values)
 20°C100°C250°C500°C
Thermal expansion coefficient (10-6/K)11.111.411.812.6
Thermal conductivity (W/mk)20.522.123.625.1
Young modulus (Kn/mm2)218210202180
Heat treatment
TREATMENTTEMPERATUREHOLDING TIME (HT)COOLINGCOMMENTS
AnnealingHeat to 780 - 800 °CMin. H.T. for 2 minute /mmAir or furnaceIn order to obtain hardness lower than 240 HB ( 23 HRC) to improve machinability
Stress relievingHeat to 30 °C below tempering temperatureMin. H.T. for 2 minute /mmAir or furnaceTo be carried out after machining, is recommended to eliminate the residual stresses induced by mechanical working
HardeningHeat to 1000-1050°CMin. H.T. for 1 minute /mmOil – Gas air-
TemperingHeat to 170 – 270°CMin. H.T. for 3 minute /mmAir or furnaceTo be carried out soon after the hardening according to the required hardness; at 170 – 270°C in order to match hardness and resistance to corrosion; permanence for at least 2 hours; tempering must be repeated at least twice at a temperature 30°C lower than the previous
C.C.T. curve

12083-cct-curve-img

Tempering curve

12083-tempering-curve-img

Related Products